Draft — not yet finally notified; your 2014 bye-laws apply until your GBM adopts the new ones.
Adoption required once notified: under the Maharashtra Co-operative Societies Act, a model bye-law does not automatically bind a society. Once these bye-laws are officially notified, each society must separately adopt them by a resolution in its General Body Meeting (GBM). Until then, your existing (2014) bye-laws continue to apply.
Consultation: the Co-operative Department invited suggestions on this draft at coophsgmodelbyelaws@gmail.com; that window closed on 27 August 2026.
Category II – Serious Violations
(a) The following shall ordinarily constitute Category II (Serious) violations—
(i) unauthorised structural alteration or demolition;
(ii) unauthorised construction, extension or encroachment;
(iii) alteration affecting structural stability or waterproofing;
(iv) obstruction of fire exits, refuge areas or emergency access;
(v) damage to common property, lifts, electrical systems, pumps, fire-fighting systems or other common installations;
(vi) unauthorised occupation or exclusive use of common areas;
(vii) unauthorised change of user or commercial use requiring statutory permission;
(viii) unauthorised installation of permanent structures, advertisement boards, communication equipment or renewable energy systems on common property;
(ix) pollution, hazardous activities or storage of dangerous materials;
(x) cutting of trees or damage to landscaping;
(xi) any violation requiring action by the Municipal Corporation, Fire Authority, Planning Authority, Police or any other competent authority;
(xii) any act likely to endanger life, structural safety or public safety.
(b) Every violation not falling under Bye-law No. 175 shall not automatically be treated as a Category II violation unless it falls within sub-bye-law (1).
What to do next
Need the form that goes with this bye-law?
Generate 2026 Forms