Skip to main content

Drafted from the Cooperative Commissioner's consultation draft of the Model Bye-laws 2026 — not yet finally notified. Verify the bye-law/rule number against the gazetted text once issued.

Form 29Parking & EV Charging Free Download

EV Installation Compliance / Inspection Checklist

Draft 2026 Bye-law / Rule No.: 83(g)

Generate This Form

Free · Form 29

1 Fill details · 2 Download PDF · 3 Print & sign

Related: Draft Bye-law 83 (2026) – Installation and Use of Electric Vehicle Charging Facilities

When to Use This Form

Use this form when the society carries out a post-installation or periodic inspection of a member's private EV charging facility to verify safety and bye-law compliance.

Information You Will Need

  • Flat/Unit No., member name and Parking Space No.
  • Date of original NOC (Form 28) and date of inspection
  • Findings on each compliance checklist item

How to Submit

1

Generate PDF

Use the "Generate This Form" box → fill in your details → download the PDF.

2

Print the form

Print on plain A4 paper.

3

Sign & attach

Sign with pen at all required signature places, and attach any enclosures listed above.

4

Submit to Society

Hand over the signed form to the Society Secretary with the required enclosures listed above.

Do you need more than just this form?

Most society transactions under the 2026 bye-laws require several forms together. Our Bulk Wizard asks about your transaction, identifies ALL the forms you need, and generates them in one PDF.

Use Bulk Wizard — Tell us your transaction

Related Forms You May Also Need

Share This Form

Help another society member find this form:

WhatsApp